Troubleshooting

Is it the first pour, or every pour?

Foam has several possible causes. Start with what you can observe, then check one thing at a time in your refrigerated, CO₂-served home setup.

What are you seeing?

Start with an observation

Choose what you can confirm, then show your checks. You'll get a useful order, rather than a diagnosis based on one symptom.

Why the first pour and every pour need different checks

Compare the pattern before changing settings. It helps you describe the problem and choose what to inspect next. More than one cause can be present.

Only the first pour after a pause is foamy
A warmer tower, faucet, or exposed section of line is worth checking. Compare the beer's liquid temperature across the pours and inspect the equipment's cooling arrangement. A cold cabinet display does not establish the temperature at the faucet.
Every pour is foamy
Confirm the liquid temperature against the brewery's target, then check the complete dispense setup: settings, visible line restrictions, tubing specification, and the service record. The symptom alone does not identify which part is responsible.
The problem started after delivery or a setup change
Write down what changed and when: keg transport, gas connection, regulator, tubing, or cleaning. Follow the supplier's chilling and settling guidance. If it began with a tank change, use the CO₂-swap troubleshooting guide alongside these observations.
Two paths to check in a home kegerator Gas travels from the CO2 cylinder through the regulator to the keg. Beer travels from the keg through a line to the tower and faucet. The tower can have different cooling conditions from the cabinet. Refrigerated cabinet CO₂ Regulator Keg Faucet Tower / exposed line Beer path
A cold cabinet does not confirm the temperature along the whole beer path. This is a simplified layout; your equipment may differ.

Keep four useful observations together

  1. Pattern: first pour after a pause, every pour, or not yet compared.
  2. Measurements: liquid temperature with units, the pressure shown, and the tubing details you can confirm.
  3. History: recent delivery or equipment changes and the last completed service.
  4. Instructions: the brewery's serving target and the manual for the actual equipment.

The free observation-sheet PDF gives you a place to keep these notes for the equipment supplier. For line planning, the line-length estimate makes its resistance and height assumptions visible.

Sources: MoreFlavor's KOMOS guidance explains first-pour tower cooling for that equipment. Micro Matic's troubleshooting guide covers the wider temperature, pressure, and maintenance checks. This is a check order, not an equipment diagnosis. Reviewed October 26, 2026.

Free printable PDF

Foamy-pour observation sheet

Keep the pour pattern, temperature readings, equipment details, and recent changes together for your next check.

No signup. Print a blank copy, or use the interactive tool on this page. These PDFs contain no saved records.


Why these checks?

Warm beer, temperature changes along the path to the faucet, pressure, and maintenance can all affect a pour. Follow the brewery's target for your beer. Get equipment-specific advice before changing the system.

Source review: October 25, 2026.

Edited by Daniel Stevens. Sources checked October 26, 2026. How we research our guides.